Electrical Construction Lead Engineer Chez Framatome
Présentation de l'entreprise
Leader international de l’énergie nucléaire
Description de l'offre
EDF EPR Engineering UK (EPR-E) is a subsidiary of Edvance, which is a joint venture between EDF and Framatome, established in 2018 in charge of the design and the realisation of nuclear islands for new projects in France and worldwide.In particular, EPR-E is responsible for the design and construction of the nuclear island for Hinkley Point C (HPC) project and preparing the design replication and engineering activities for the Sizewell C (SZC) Project.At HPC we are building two new nuclear reactors, the first in a new generation of nuclear power stations in the UK providing low carbon electricity for around six million homes.Hinkley Point ‘C’ (HPC) is a vital part of the UK’s future energy strategy. As the first of the UK’s next generation of nuclear power stations (EPR), HPC is both of high profile and high complexity. The project is delivered through an organization that comprises multi-disciplinary teams. The MEH program is assigned to deliver the Mechanical / Electrical / HVAC component in terms of Engineering, Procurement, and Construction (EPC). For the HPC project, we are currently looking to recruit for the role of Electrical Construction Lead EngineerThe Electrical Construction Lead Engineer has the responsibility to ensure delivery of the Electrical activities for the life cycle of the contract or work package in accordance with the buildings Project schedule. He is reporting to the Project Manager of his area or disciplines. He will ensure planning and delivery in accordance with all safety, quality, time, and cost parameters to meet the needs of the Project.Electrical Construction Lead Engineer on behalf on NNB (HPC) is in charge of the following:Guarantee that Safety is the overriding priority for any activity performed during Pre-Construction activities which includes nuclear safety as well as Industrial Safety. Planning the work must also recognize the importance of a strong Nuclear Safety and Quality culture (conformance with the requirement, implementation of the site adaptation, non-conformance treatment) and the importance of a “right first-time” attitude including the implementation of lessons learnt and share good practice.Drive the electrical activity in a building from the site delivery to the handover to Commissioning. This includes all the preparation activities before the physical start of the activities in the building (documentation, procurement of material, interfaces with other Programmes, synthesis of MEH activities, commissioning needs, access) by gathering project data and producing reports for management review.Implementation of the MEH L4 schedule (4 weeks and 16 weeks look ahead)Warn the management in case of change and potential risks.
FORMULAIRE DE RÉPONSE À L’OFFRE
Attention
- Nous vous conseillons de désactiver les bloqueurs de publicité de type AdBlock pour assurer la bonne validation du formulaire.
- Si vous ne parvenez pas à postuler, utilisez notre formulaire simplifié.
pas encore inscrits ?
Créer un compte candidat vous permet :
- l'enregistrement de vos informations pour ne pas avoir à les resaisir plusieurs fois
- la conservation d'un historique de vos candidatures
- la possibilité d'être contacté directement par plus de 1000 entreprises